PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Compacting the Locker rooms Facing West (800x600).jpg Excavation at Rahway Ave. (800x600).jpg Excavation hafway across Rahway Ave. Facing North (800x600).jpg Installing and tying rebar mats at Elev. 1,2,3 (4th Floor) Facing South-East (800x600).jpg Installing shear wall panels at Stair -2-Elev. 4 (4th Floor) Facing South (800x600).jpg
Previous page Installing shear wall panels at Stair -2-Elev. 4 (4th Floor) Facing South (800x600)
Installing shear wall panels at Stair -2-Elev. 4 (4th Floor) Facing South (800x600)